Project Overview & System Type
This case study examines a proposed smoke control strategy for a six-storey residential development arranged around protected stair cores and corridor-based smoke ventilation. The scheme supports a stay-put evacuation strategy and uses two different smoke control philosophies across the building: Levels 1 to 4 employ enhanced mechanical smoke extract with a natural replacement air shaft, while Level 5 adopts an intelligent reversible push-pull arrangement in which one shaft extracts and the opposite shaft supplies replacement air.
The Engineering Challenge & Regulatory Framework
The engineering challenge was to demonstrate that both corridor tenability and firefighting access conditions could be maintained without allowing smoke to contaminate the protected stairs. The study was developed against Approved Document B, BS 9991:2024, BS EN 12101, Smoke Control Association guidance, and a Qualitative Design Review that defined the fire scenarios, tenability criteria, and expected system response.
CFD Modelling & Analysis Methodology
Transient CFD simulations were carried out in NIST Fire Dynamics Simulator. Three worst-case apartment fire scenarios were tested: a Level 1 flat close to a stair core, a Level 5 flat furthest from the escape stair to stress corridor tenability, and a Level 5 flat closest to the stair to create the most onerous stair-protection condition. Each scenario used a medium-growth t-squared design fire with a 1 MW peak heat release rate, polyurethane fuel properties, and a soot yield of 0.1 so that smoke movement, heat, visibility, airspeed, and pressure conditions could all be assessed together.
Performance Criteria & Design Checks
The performance objectives focused on maintaining usable escape and firefighting routes while limiting pressure effects that could impede door operation. Acceptance criteria included temperatures below 60°C for means of escape, visibility above 10 metres, airflow velocities below 5 m/s, and pressure differentials below 50 Pa. Particular attention was given to the transition period immediately after apartment door opening, because that interval controls whether smoke reaches the adjacent stair before the ventilation system ramps up.
Results & Performance Outcomes
The simulations showed that corridor conditions remained within the target tenability limits in all assessed scenarios. Visibility, temperature, airflow velocity, and pressure criteria were satisfied, and the prescribed heat release rate profiles were achieved as intended. The modelling therefore confirmed that the proposed systems provide effective corridor smoke management and acceptable firefighting-route conditions for the building layouts studied.
By comparing scenarios at different locations, the analysis also gave the design team insight into the interaction between apartment layouts, system response and protected stair interfaces.
Value Delivered & Design Implications
The CFD study provided a performance-based foundation for design decisions, demonstrating the corridor ventilation performance and giving the team focused evidence to develop the stair protection strategy. This approach supports coordinated decisions on layouts, controls and smoke ventilation across the building.