Case Study 1

Student Accommodation Corridor and Lobby Smoke Control

CFD assessment of mechanical smoke ventilation across six fire scenarios, examining escape-route conditions and protection of stairs and evacuation lift lobbies.

Project Overview & System Type

This study assessed proposed mechanical smoke control for the upper-level corridors and lobbies of a purpose-built student accommodation development. The assessment considered how the system would protect the associated stairs and evacuation lift lobbies during escape and firefighting. The modelled arrangements included extract-led ventilation and, where appropriate, supply and extract working together to direct airflow.

The Engineering Challenge & Regulatory Framework

Different corridor layouts, travel distances and fire locations required scenario-specific performance objectives. The assessment used the available project fire engineering information, BS 9991:2024 and relevant Smoke Control Association guidance. The objectives included limiting sustained smoke accumulation in protected stairs and lobbies and, for specified scenarios, restoring tenable escape-route conditions after the fire compartment door closed.

CFD Modelling & Analysis Methodology

Six fire scenarios were assessed using NIST Fire Dynamics Simulator. Models represented the fire compartment, corridor, evacuation lift lobby, stair, ventilation openings and leakage paths through closed doors. A 1 MW design fire was used, and the simulations included a detection and control delay followed by fan and damper response rather than assuming instantaneous system operation.

Simulation Scenarios & Verification Strategy

The analysis brought together smoke movement, visibility and temperature during escape with checks on firefighting access, air velocity, pressure and carbon monoxide. Comparing the ventilation arrangements across multiple fire locations gave the design team a detailed picture of how airflow and smoke control performance interact.

Results & Performance Outcomes

The simulations provided detailed evidence on smoke protection for the stairs and evacuation lift lobbies, as well as conditions along the escape routes. The assessed firefighting access routes remained within the applicable temperature limits during the firefighting phase, giving the design team valuable insight into system performance across the modelled scenarios.

Value Delivered & Compliance Impact

By translating complex fire scenarios into clear performance evidence, the study supported informed decisions about the proposed smoke control strategy. The analysis gave the project team a practical basis for developing the ventilation design around the building's corridors, lobbies and protected stairs.